Division of Sanitary

Saensuk Municipal Office

Division of Sanitary 

Works takes responsibility controlling of following functions;

      - Garbage and Waste Disposal

      - Wastewater Control and Treatment

      - Environment Quality Management

      - Water Quality Analysis and relevant assignments

Application to Obtain Permit for Connection of Wastewater Pipe/ Drain

To apply the Permission for Connection of Wastewater Pipe;

In Case of New Building

      - Submit application form of ข.1 type to Saensuk Municipality’s Division of Public Works to get the permission for connection of wastewater pipe. In case of the building whose building permit has been granted, below document required;

In case of Building with granted Permission, please submit below document.

      - Copy of Identification Card (Owner of Wastewater Site) 1 set

      - Copy of House Registration (Owner of Wastewater Site) 1 set

      - Copy of Water Fee Receipt in Last 3 Months

      - Copy of Company Registration and Purpose (in case the applicant is Corporate Body) 1 set

      - Copy of Document indicated that applicant is representative of the Corporate Body (in case the applicant is corporate body) 1 set

      - Brief Layout of Place and Wastewater Connecting Point 1 set

To apply the Permission for Connection of Drain Pipe;

       - Copy of Identification Card (Owner of Wastewater Site) 1 set

      - Copy of House Registration (Owner of Wastewater Site) 1 set

      - List of System Calculation and Type of Wastewater Treatment 1 set

      - Drain Water Quality Inspection Report from Reliable Institution, or Certified by Government Official 1 set

      - Letter of Acceptance and Guarantee from Designer and Estimator of Wastewater Treatment System 1 set

      - Copy or Photo of License for Professional Practice of the Designer and Calculator of Wastewater Treatment Charge 1 set

      - Layout of Location and Drain Water’s Pipe Line and Drain Water’s Connecting Point 1 set

      - Other document as required in Application Form of Drain Water Connection

     * Proceeding lead time shall be about 10 days.

Rate of Pipe Connecting Fee

     - Wastewater Volume/ Drain Water below 20 Cubic Meters/ Month : Rate of 100 Baht/ Point

     - Wastewater Volume/ Drain Water over 20 Cubic Meters/ Month but less than 100 Cubic Meters : Rate of 300 Baht/ Point

     - Wastewater Volume/ Drain Water over 100 Cubic Meters/ Month but less than 100 Cubic Meters : Rate of 2,000 Baht/ Point

Collection of Waste Disposal Service Charge

Waste Disposal Operated by Saensuk Municipality

Pawn Shop

Internal Audit

Office Municipal Clerk

Technical Services Planning

Education

Social Works

Public Health and Environment

Public Works

Sanitary

Finance